Beijing Subway Map
Notes to Beijing Subway:

Right now the Beijing Subway has:
Line 1: from west to east
Line 2: loop line around the old city downtown
Line 4: Summer Palace to Gongyiqiao West (公益桥西)
Line 5: from north to south (going to Yizhuang)
Line 8: Olympic Branch: From the transfer station Beitucheng (Line 10)to Olympic Forest Park, if you want to go to the Olympic Park, this line is the only choice.
Line10: west to east then to south
Line13: another loop line in the north
Airport light railway: From Dongzhimen and Sanyuanqiao to Airport (T3, T2, T1), starts at every 30 mins, ticket: 25yuan/one way
BaTong Line: west (sihui) to east (tuqiao)
And the lines coming into operation:
Line 6: West-East line, will parallel with Line 1, it will be finished in 2012;
Line 7: West-East-South
Line 10: Make a larger loop line, the Phase II will be finished in 2013
Line 14: West-East-North
Line 15: West-East-North, from Summer Palace to Shunyi, 2008-2012
View Beijing Subway Map in a larger map

Beijing Line1 and Line 2 Subway Station.

Beijing Subway Station at Line 5.

Beijing Subway Station at Line 4.
